Do you require structural, electrical or both engineering stamps on plans?

At this time we are not requiring structural or electrical engineered plans however this is subject to change in the near future. Also anytime upon inspection an inspector may ask for a letter from a Texas Structural Engineer with his stamp verifying that the existing roof structure is adequate for the increased loads from the installed array(s).